TianGong Life Cycle Inventory
Data stock: Default root data stock [ Download ]

Process data set overview page

Data set: Air stripping unit ; Facility construction ; Pump & treat ; Groundwater remediation ; Ex-situ (01.00.005)

Full name
Air stripping unit ; Facility construction ; Pump & treat ; Groundwater remediation ; Ex-situ
Location
JS-CN
Reference year
2022
Valid until
Reference flow(s)
Type
Unit process, single operation
Parameterized?
no
LCIA results included?
no
Category
Other Services / Repair and maintenance
Synonyms
Use advice for data set
Users of this dataset should consider the specific regional context and contaminant profile of the groundwater at the Jiangsu site when applying the data for similar remediation activities. The representativeness of the material allocation, energy consumption, and emission factors may vary depending on the geographic location and technological practices implemented elsewhere. It is essential to ensure methodological consistency when integrating this data with other LCA datasets, particularly with respect to the inclusion or exclusion of recycling processes for the materials used (aluminum, HDPE, and steel) and the modeling of the use phase behavior.
Data set use approval
General comment
The site is a closed pesticide manufacturing plant. The water table is located around −4 m (below the ground). The aquifer mainly consists of silty sand with approximately 20 m depth, and the aquitard containing silty clay is located at about −24 m to −33 m. Other hydrogeological parameters include water content 26.33 %, hydraulic conductivity 0.00105 cm/s, groundwater gradient 0.008, Darcy velocity 0.73 cm/d, and actual velocity 1.83 cm/d. High concentrations (hundreds of mg/L) of VOCs were detected in the groundwater including BTEX, vinyl chloride (VC), 1,2-dichloroethane (1,2-DCA), chlorobenzene, 1,2-dichlorobenzene, and 1,4-dichlorobenzene.
LCI Method Principle
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
  • Dependent internal review by
License and access conditions
Copyright
no
License type
Free of charge for all users and uses
Owner of data set
Tiangong LCI Data Working Group
Technical purpose
The air stripping unit described by this dataset is utilized in the ex-situ remediation process of contaminated groundwater within the framework of pump and treatment systems. Specifically, it is for the treatment of groundwater polluted by pesticides at a closed manufacturing plant in Jiangsu Province, China. This equipment, which is constructed using aluminum, high-density polyethylene (HDPE), and steel, is engineered to remove volatile compounds from groundwater by transferring them to the air phase through the process of air stripping.
Input Products
No records found.
Co-Products
No records found.
Data set version
01.00.005
Time stamp (last saved)
2024-05-10T10:10:06+08:00
Data set format
Compliance systems
No records found.
Tag
Registered in
Process is not registered in any registry
Data Set deregistration
Are you sure you want to deregister selected dataset?
Please enter the reason of deregistration and confirm.